Move your first production VM onto Kubermatic Virtualization (KubeV). We build and harden a production-grade KubeV platform on your hardware, with observability, alerting, backup and a tested restore, then migrate and cut over one of your application VMs (Ubuntu or Windows) within an agreed downtime window. You get a repeatable runbook and wave plan for the rest of your estate.

Goal

A production KubeV platform your team operates independently, your first application VM running on it, and a proven method to migrate the remaining estate.

Who it is for

Teams that have chosen KubeV as their virtualization platform, or completed a Proof of Value, and are ready to start moving production workloads.

Phases

  1. 01

    Design validation and sizing

    Topology, sizing, source assessment and go-live criteria.

  2. 02

    Platform installation

    Production KubeV with etcd quorum across failure domains.

  3. 03

    Networking, isolation and storage

    VPC, subnets, IPAM, VLANs and live-migration-ready storage.

  4. 04

    VM operations

    Lifecycle, live migration and host-failure recovery.

  5. 05

    Migration preparation and wave planning

    Mappings, cutover and rollback plan.

  6. 06

    Migration and cutover

    Your application VM moved within the agreed window.

  7. 07

    Hardening, backup and restore

    Production checklist, backups, restore test and alerting.

  8. 08

    Lifecycle validation

    A full platform upgrade with your VM running.

  9. 09

    Operational readiness

    Documentation, enablement and go-live review.

Typical Activities

What our engineers and your team work through together.

  • Sizing

    Hardware bill of materials from the KubeV Sizing Tool

  • Production hardening

    Against Kubermatic's production checklist

  • Backup and restore

    Platform state and VM volumes, with a timed restore test

  • Alerting

    Routed to your channel and verified with a test condition

  • Migration preparation

    Network and storage mapping, disk import and guest preparation

  • Cutover

    With a documented rollback plan, validated by the application owner

  • VM lifecycle campaign

    Create, migrate and delete VMs to prove stability and clean teardown

  • Wave planning

    For the remaining estate, grouped by application dependency

Deliverables

#AreaWhat you receive
01Design and sizingTopology, sizing record, hardware bill of materials, frozen go-live criteria
02PlatformHardened, HA KubeV installation with Git-managed configuration
03Networking and storageConfigured networks and isolation, live-migration-ready storage, as-built docs
04MigrationYour application VM migrated and accepted, cutover and rollback plan, repeatable runbook
05ResilienceLive migration and host-failure results
06Backup and upgradeBackup configuration, documented restore test, documented upgrade cycle
07OperationsOperations documentation, enablement, signed go-live readiness review

Why this Accelerator?

  • A real production move

    Not another test.

  • Safe cutover

    Rollback stays available until the application owner signs off.

  • Day-2 proven up front

    Restore, upgrade and host failure tested before go-live.

  • A blueprint for the estate

    Runbook and dependency-based wave plan.

  • Your team owns it

    With the docs and skills to run the platform and migrate on.

Prerequisites

What your side provides. We confirm everything together during design validation and sizing.

Infrastructure

  • Hypervisor hosts racked and powered, with VT-x or AMD-V enabled
  • Host OS installed (Ubuntu 24.04 LTS or agreed alternative)
  • Storage backend with ReadWriteMany or Block volume mode, plus a backup target
  • VLANs trunked to every host, LACP/MLAG and out-of-band management
  • IP addressing and firewall rules in place

Access & Tooling

  • VPN or jump host access
  • A shared Git repository
  • Admin access and VM inventory for your source environment

People & Goals

  • Application VM selected, owner named, dependencies documented, downtime window agreed

Subscription

  • A KubeV production subscription

What's not included

Migration beyond one application VM, application changes or containerization, in-guest administration and licensing, 24/7 operations, multi-site rollout, physical infrastructure, fabric routing and source platform decommissioning. The KubeV subscription is contracted separately.

Optional extensions

Further migration waves, multi-region rollout, KKP on KubeV, KubeLB, GPU or SR-IOV, and managed 24/7 operations.