Kubermatic Virtualization VM Migration
Overview
Move your first production VM onto Kubermatic Virtualization (KubeV). We build and harden a production-grade KubeV platform on your hardware, with observability, alerting, backup and a tested restore, then migrate and cut over one of your application VMs (Ubuntu or Windows) within an agreed downtime window. You get a repeatable runbook and wave plan for the rest of your estate.
Goal
A production KubeV platform your team operates independently, your first application VM running on it, and a proven method to migrate the remaining estate.
Who it is for
Teams that have chosen KubeV as their virtualization platform, or completed a Proof of Value, and are ready to start moving production workloads.
Phases
- 01
Design validation and sizing
Topology, sizing, source assessment and go-live criteria.
- 02
Platform installation
Production KubeV with etcd quorum across failure domains.
- 03
Networking, isolation and storage
VPC, subnets, IPAM, VLANs and live-migration-ready storage.
- 04
VM operations
Lifecycle, live migration and host-failure recovery.
- 05
Migration preparation and wave planning
Mappings, cutover and rollback plan.
- 06
Migration and cutover
Your application VM moved within the agreed window.
- 07
Hardening, backup and restore
Production checklist, backups, restore test and alerting.
- 08
Lifecycle validation
A full platform upgrade with your VM running.
- 09
Operational readiness
Documentation, enablement and go-live review.
Typical Activities
What our engineers and your team work through together.
Sizing
Hardware bill of materials from the KubeV Sizing Tool
Production hardening
Against Kubermatic's production checklist
Backup and restore
Platform state and VM volumes, with a timed restore test
Alerting
Routed to your channel and verified with a test condition
Migration preparation
Network and storage mapping, disk import and guest preparation
Cutover
With a documented rollback plan, validated by the application owner
VM lifecycle campaign
Create, migrate and delete VMs to prove stability and clean teardown
Wave planning
For the remaining estate, grouped by application dependency
Deliverables
| # | Area | What you receive |
|---|---|---|
| 01 | Design and sizing | Topology, sizing record, hardware bill of materials, frozen go-live criteria |
| 02 | Platform | Hardened, HA KubeV installation with Git-managed configuration |
| 03 | Networking and storage | Configured networks and isolation, live-migration-ready storage, as-built docs |
| 04 | Migration | Your application VM migrated and accepted, cutover and rollback plan, repeatable runbook |
| 05 | Resilience | Live migration and host-failure results |
| 06 | Backup and upgrade | Backup configuration, documented restore test, documented upgrade cycle |
| 07 | Operations | Operations documentation, enablement, signed go-live readiness review |
Why this Accelerator?
A real production move
Not another test.
Safe cutover
Rollback stays available until the application owner signs off.
Day-2 proven up front
Restore, upgrade and host failure tested before go-live.
A blueprint for the estate
Runbook and dependency-based wave plan.
Your team owns it
With the docs and skills to run the platform and migrate on.
Prerequisites
What your side provides. We confirm everything together during design validation and sizing.
Infrastructure
- Hypervisor hosts racked and powered, with VT-x or AMD-V enabled
- Host OS installed (Ubuntu 24.04 LTS or agreed alternative)
- Storage backend with ReadWriteMany or Block volume mode, plus a backup target
- VLANs trunked to every host, LACP/MLAG and out-of-band management
- IP addressing and firewall rules in place
Access & Tooling
- VPN or jump host access
- A shared Git repository
- Admin access and VM inventory for your source environment
People & Goals
- Application VM selected, owner named, dependencies documented, downtime window agreed
Subscription
- A KubeV production subscription
What's not included
Migration beyond one application VM, application changes or containerization, in-guest administration and licensing, 24/7 operations, multi-site rollout, physical infrastructure, fabric routing and source platform decommissioning. The KubeV subscription is contracted separately.
Optional extensions
Further migration waves, multi-region rollout, KKP on KubeV, KubeLB, GPU or SR-IOV, and managed 24/7 operations.